Welcome

Latest News

San Antonio’s municipally owned utility, CPS Energy, is offering a variety of energy-related rebates in order to support their Save for Tomorrow Energy Plan (STEP). In the past, these rebates have been administered by CPS Energy directly, but as of September 1, 2016, they are administered entirely by CLEAResult through a contract with CPS Energy.

In an earlier article, we reported on commercial energy efficiency rebates. In this article, we shall report on commercial whole building optimization rebates. In contrast to the former, the latter are being newly introduced through CLEAResult.

The Preconstruction Meeting is the project milestone that represents the transitional point between the design phase and the physical construction of the project. Preconstruction meetings are critical to ensuring that the entire project team has a complete understanding of the owner’s vision for a project, and are the best time to establish proper expectations, requirements, and communication protocols. 

1344 S. Flores, Suite 101 San Antonio, Texas 78204   (210) 447-6100

© 2017 Cleary Zimmermann Engineers. All rights reserved. | Website by Texas Creative | Admin Login

X