Prairie View A&M University Billy Nicks Stadium

Prairie View A&M University
Prairie View, TX

As part of our contract for Capital Renewal Projects with Prairie View A&M University, our team replaced and upgraded 35 air handling units as well as upgraded the controls systems to accomodate airside economizers, leaving air temperature reset and humidity control in the Billy Nicks Stadium.


The stadium presented unique challenges with it’s circular floor plan where air handlers were placed lining its perimeter. The stadium’s original design did not allow wide enough access for the units to be removed and replaced, so the outer metal skin of the building was removed to open up the areas. With these complex needs, Cleary Zimmermann served as prime consultant on the project, managing structural and architectural subconsultants. Ultimately, we delivered the project on time and under budget.

 

Image Source: Stadium Journey

1344 S. Flores, Suite 101 San Antonio, Texas 78204   (210) 447-6100

© 2022 Cleary Zimmermann Engineers. All rights reserved. | Website by Texas Creative | Admin Login

X