New Braunfels Utilities Sam C. McKenzie, Jr. Water Reclamation Facility

New Braunfels Utilities
New Braunfels, TX

Electrical, Controls and SCADA rough-in design for a (10 MGD-final build-out) wastewater recovery facility consisting of a headworks and lift station, filter, digester, clarifiers, aeration basins, UV disinfection, belt press, chemical feed and administration buildings/structures. The virgin site electrical system was designed in a medium voltage radial feed configuration in conjunction with New Braunfels Utility Electrical department requirements. Site design included a medium voltage switchgear electrical building as hub to distribute medium voltage power underground to pad-mounted transformers at 4 site locations to reduce feeder size. Fiber optic communication cabling, also routed underground, was terminated at SCACA RTU’s to link system to demarc located at administration building MDF room. Additional fiber optic communication was routed for security for the site.

 

Image Source: TRC

1344 S. Flores, Suite 101 San Antonio, Texas 78204   (210) 447-6100

© 2018 Cleary Zimmermann Engineers. All rights reserved. | Website by Texas Creative | Admin Login

X