Methodist 10 Central Renovations

Methodist Hospital
San Antonio, TX

This project was the first phase of a larger scope renovation process, and involved the moving of mechanical air handling and ventilation equipment from the 10th floor to a newly constructed mechanical room on the roof in order to allow additional patient care beds to be placed on the 10th floor. A Chilled Water Hydronic Analysis was performed to determine why the chilled water supply to the 10th floor was inadequate and to provide a feasible solution. The change over process was performed while floors 6-9 were occupied. MEP renovations on the 10thfloor included new air distribution, lighting, and plumbing systems, while the 11th floor received full MEP systems to accommodate additional patients.

1344 S. Flores, Suite 101 San Antonio, Texas 78204   (210) 447-6100

© 2023 Cleary Zimmermann Engineers. All rights reserved. | Website by Texas Creative | Admin Login