Green Valley Special Utility District Weil Road Booster Station

Schertz, TX

Electrical and controls design for a new booster station. The first phase of the project incorporated two (2) 125 hp booster pumps with future provisions for an additional two (2) 125 hp booster pumps. In addition, the project incorporated a 500,000 gallon ground storage tank with provisions for a second future 500,000 gallon ground storage tank. The booster station is located at a virgin site so utility power routing was coordinated with Guadalupe Valley Electrical Cooperative. Finally, a 300 kW diesel generator was specified for the initial phase of the project at the owner’s request. Switchgear/MCC/ATS selection as well as generator conductors sizing was specified to allow for the future expansion of the site.